Condo: St. Thomas Walk


Technical Manager:
-       Prepare precast panel proposal,
-       Settle technical issues, 
-    Prepare precast shopdrawing
-    Provide technical support to internal and external customers,
-       Manage daily operation of the design department,  
-    Meet the target set by the company,
      -    Fully manage and be responsible for any technical aspects.

The residential project included 1 block 35th sty and 1 block 36th sty condominium flats (total 219DU) with 2 basement carparks located at St. Thomas Walk. I was project engineer to oversee the project.

The building was high rise building, it was very slender. The max acceleration was very near upper limit. Thus, wind tunnel test should be done to address the concern.