Wednesday, January 1, 2014

Home Team Training Center

Technical Manager:
-       Prepare precast panel proposal,
-       Settle technical issues, 
-    Prepare precast shopdrawing
-    Provide technical support to internal and external customers,
-       Manage daily operation of the design department,  
-    Meet the target set by the company,
      -    Fully manage and be responsible for any technical aspects.

The two storey building was one of block in Home Team training center. Prefab Technology was engaged as percaster to design, produce and deliver precast façade for 1st sty. 


Due to tight schedule, the structural work of building was already built to 2nd sty, thus, those façade at first storey could only be installed as non-critical panels. The panel needed to be inserted in between first storey slab and soffit of 2nd sty beam. Since the gap between panel and slab/beam was only about 25mm, it was not possible to install any lifting hook on top of panel for crane to lift the panel, we decided to use forklift to install panel. The panel would be hoisted near to final position, then use forklift to insert in the window and push into final position. And for those panels without window, small slot holes were provided for forklift installation purpose.